Pyrolase(TM) 160 has been evaluated in the lab in Jinlin oil field and obtained satisfied result
Pyrolase(TM) 160 was evaluated in the Fracturing Center of the Institute of Drill and Extraction in Jilin oil field in September 2006 and obtained satisfied result. Well trails will be performed in the beginning of 2007.
|